rubbish chutes brisbane and gold coast - construction industry

BALCONY APPLICATION

This method of installation is ideal for renovations of units that have a concrete slab above.

Two acrow props are used with a chute bracket attached and the temporary rubbish chute is winched up from ground level.

A loading hopper can be installed on every floor allowing the chute to go the full height of almost any building but must be supported at least every 15 metres.

When there is no concrete slab above, when assemble a scaffold frame that is dyna bolted down.

We can arrange for a site inspection to ensure suitability.

2005 Qwikchutes | Created and hosted by Virtual Creations